Case study
Newton House, Preston: a whole block, one programme
Boiler Upgrade Scheme, ECO and GBIS

Location
Preston, Lancashire
Funding
Boiler Upgrade Scheme and ECO (heat pumps), GBIS (flat roof insulation)
Property
24 flats in one block
Our role
Coordination of every home as a single programme
Year
2025
24
flats
24
heat pumps
3
funding streams
c. £194k
including VAT
On site

Social value. Every household in the block moved off a very old electric boiler in the same programme, so no flat was left behind.
The project
Newton House is a block of 24 flats in Preston. Every flat was heated by a very old, inefficient electric boiler, and the top-floor flats sit under flat roofs.
What we did
We coordinated all 24 homes as one programme rather than 24 separate jobs. Three funding streams paid for the work, each with its own rules and evidence, and all three had to be satisfied for the same homes.
Why it matters
Blended funding is where programmes often stall: each scheme has its own eligibility and evidence. Bringing the Boiler Upgrade Scheme, ECO and GBIS together let the whole block be treated at once. The roof was insulated while the flats were already being worked on, so fabric and heating were dealt with together.
Result
Every flat moved from a very old electric boiler to its own air source heat pump, and the top-floor flats gained flat roof insulation. Project value was circa £194,000 including VAT across all 24 flats.
Measures installed
-
A Trianco 5 kW air source heat pump in every flat, 24 in all, each replacing the electric boiler in that flat
-
Flat roof insulation to the top-floor flats, delivered in the same programme as the heating
Measures installed
Installed by


Programme and coordination


The project
Newton House is a block of 24 flats in Preston. Every flat was heated by a very old, inefficient electric boiler, and the top-floor flats sit under flat roofs.
What we did
We coordinated all 24 homes as one programme rather than 24 separate jobs. Three funding streams paid for the work, each with its own rules and evidence, and all three had to be satisfied for the same homes.
Why it matters
Blended funding is where programmes often stall: each scheme has its own eligibility and evidence. Bringing the Boiler Upgrade Scheme, ECO and GBIS together let the whole block be treated at once. The roof was insulated while the flats were already being worked on, so fabric and heating were dealt with together.
Result
Every flat moved from a very old electric boiler to its own air source heat pump, and the top-floor flats gained flat roof insulation. Project value was circa £194,000 including VAT across all 24 flats.
Measures installed
-
A Trianco 5 kW air source heat pump in every flat, 24 in all, each replacing the electric boiler in that flat
-
Flat roof insulation to the top-floor flats, delivered in the same programme as the heating
Who was involved
Heat pumps
Trianco
Coordination

Funding
Boiler Upgrade Scheme
ECO
Roof insulation funding
Great British Insulation Scheme
Photo Gallery

Keep exploringKeep exploring
See our case studies
Case Study
Social Housing Decarbonisation Fund, three blocks, delivered through RHEA Projects.