Case study

Newton House, Preston: a whole block, one programme

Boiler Upgrade Scheme, ECO and GBIS

fb505528-c76d-4550-97f3-c6e8a9b5d402.jpg
Location

Preston, Lancashire

Funding

Boiler Upgrade Scheme and ECO (heat pumps), GBIS (flat roof insulation)

Property

24 flats in one block

Our role

Coordination of every home as a single programme

Year

2025

24

flats

24

heat pumps

3

funding streams

c. £194k

including VAT

On site

091673dc-1c4f-47f1-bf73-2169ae6da832.jpg

Social value. Every household in the block moved off a very old electric boiler in the same programme, so no flat was left behind.

The project

Newton House is a block of 24 flats in Preston. Every flat was heated by a very old, inefficient electric boiler, and the top-floor flats sit under flat roofs.

What we did

We coordinated all 24 homes as one programme rather than 24 separate jobs. Three funding streams paid for the work, each with its own rules and evidence, and all three had to be satisfied for the same homes.

Why it matters

Blended funding is where programmes often stall: each scheme has its own eligibility and evidence. Bringing the Boiler Upgrade Scheme, ECO and GBIS together let the whole block be treated at once. The roof was insulated while the flats were already being worked on, so fabric and heating were dealt with together.

Result

Every flat moved from a very old electric boiler to its own air source heat pump, and the top-floor flats gained flat roof insulation. Project value was circa £194,000 including VAT across all 24 flats.

Measures installed
  • A Trianco 5 kW air source heat pump in every flat, 24 in all, each replacing the electric boiler in that flat

  • Flat roof insulation to the top-floor flats, delivered in the same programme as the heating

Measures installed

Installed by

6778f8f1-e382-448f-a0fc-cd7c6c18a4ae.png
b5870ee4-89a3-4bb7-9f67-87654407bea7.png

Programme and coordination

eb637bbf-8693-4c83-9c58-11e8346ec10c.png
6fb691e3-1ad4-4ec0-8a84-60e13b49d307.png

The project

Newton House is a block of 24 flats in Preston. Every flat was heated by a very old, inefficient electric boiler, and the top-floor flats sit under flat roofs.

What we did

We coordinated all 24 homes as one programme rather than 24 separate jobs. Three funding streams paid for the work, each with its own rules and evidence, and all three had to be satisfied for the same homes.

Why it matters

Blended funding is where programmes often stall: each scheme has its own eligibility and evidence. Bringing the Boiler Upgrade Scheme, ECO and GBIS together let the whole block be treated at once. The roof was insulated while the flats were already being worked on, so fabric and heating were dealt with together.

Result

Every flat moved from a very old electric boiler to its own air source heat pump, and the top-floor flats gained flat roof insulation. Project value was circa £194,000 including VAT across all 24 flats.

Measures installed
  • A Trianco 5 kW air source heat pump in every flat, 24 in all, each replacing the electric boiler in that flat

  • Flat roof insulation to the top-floor flats, delivered in the same programme as the heating

Who was involved

Heat pumps

Trianco

Coordination

6fb691e3-1ad4-4ec0-8a84-60e13b49d307.png

Funding

Boiler Upgrade Scheme

ECO

Roof insulation funding

Great British Insulation Scheme

Photo Gallery

Keep exploringKeep exploring

See our case studies

Flagship
Cosy Homes in Lancashire

15,782 measures coordinated, 100% TrustMark pass, with the coverage map.

Explore the programme →
90125ad1-4f46-4cb0-922d-d9322421950c.png
Case Study
Morecambe

Solar, battery and wall insulation. Warm Homes: Social Housing Fund.

View Case Study →
c469640e-b0ac-4c18-9409-281caa365416.jpg
Case Study
Darwen

A whole-house retrofit: solar, heat pump and battery, checked with thermal imaging.

View Case Study →
c54e0952-4952-4500-90b4-464ed6ae20e5.jpg
Case Study

Social Housing Decarbonisation Fund, three blocks, delivered through RHEA Projects.

View Case Study →
0d702f2a-4dc9-43c8-85b1-16a870dbf34f.jpg
Case Study
Wirral

Solid-wall flat insulated inside and out under ECO4 and GBIS.

View Case Study →
33d4e6d6-a392-4aff-afa0-d806d07cdf28.jpg
Case Study
Newton House, Preston

Boiler Upgrade Scheme, ECO and GBIS blended on one property.

View Case Study →
2686b235-92dc-46d2-a3ca-0f58606eb621.jpg
Case Study
Orbit, West Midlands

SHDF coordination with Lovell and Vinci.

View Case Study →
Case Study
Riverside and Savills

Stock condition inspections across a housing portfolio.

View Case Study →
Commercial Case Study
Crown House, Crown Oil

Solar pre-assessments across a commercial portfolio, installed by third-party specialists.

View Case Study →
2fe7ac92-b564-4f08-95a5-56d49b3db91a.jpg
Talk to us about your project
Contact us
bottom of page