Wirral: solid wall, inside and out
ECO4 and the Great British Insulation Scheme

Location
Wirral, Merseyside
Funding
ECO4 and the Great British Insulation Scheme
Property
Ground-floor flat, one of six in a converted building built between 1900 and 1929
Our role
Assessment, design, coordination, project management and lodgement
Installers
Certified contractors under their own PAS 2030 scopes
Year
2025
B
EPC band
88
SAP
400-470 mm
walls, measured
Whole
terrace treated
On site






Social value. Hard-to-treat homes brought into the programme rather than left behind, with the whole terrace treated at once.
Cosy Homes have been absolutely amazing. The difference is remarkable.
Betty Whiteside, Thornton Cleveleys
Area feedback: a Cosy Homes in Lancashire resident on the Fylde coast, not a resident of these blocks
The project
A ground-floor flat in a converted building of six, built between 1900 and 1929, with solid walls 400 to 470 mm thick. The building is one of three blocks forming a terrace, and the whole terrace was treated. This is the difficult end of the housing stock.
What we did
We assessed, designed, coordinated and project managed the work and lodged it. We measured the walls rather than assuming their thickness from the age of the building. We designed the whole package as one: fabric, generation, heating and ventilation together. We did not install; certified contractors carried out the work under their own PAS 2030 scopes.
Why it matters
Internal insulation on a solid wall moves the dew point inward, which is how insulation can cause the damp it was meant to cure. So a condensation risk analysis was produced for the build-up before it was installed, and the ventilation and insulation were designed as a single decision. An asbestos survey was carried out before any intrusive work.
Result
A pre-1929 solid-wall flat taken to EPC band B, SAP 88.
Measures installed
-
External wall insulation wherever it could be used, and internal wall insulation where it could not
-
Electric storage heating, sized against a new solar PV array
-
A ventilation strategy designed from the measured plan before any insulation was fixed
Who was involved
Wall system
Wetherby
Assessment, design and coordination

Funding
ECO4
Great British Insulation Scheme
Photo Gallery

Keep exploringKeep exploring
See our case studies
Case Study
Social Housing Decarbonisation Fund, three blocks, delivered through RHEA Projects.