top of page
RSCOREn4 (2).png
Case study

Darwen: a whole-house retrofit

Solar PV, air source heat pump and battery

fb505528-c76d-4550-97f3-c6e8a9b5d402.jpg
Location

Darwen, Lancashire

​​

Cosy Homes in Lancashire

Property

House with an extension

Our role

Coordination, whole-house survey and handover check

Year

2026

5

measures

1

whole-house survey

Thermal

imaging inside and out

Checked

handover pack on site

On site

bb1a5769-0141-43c6-8048-031ed7f18c19.jpg
71739933-6c7c-430e-bb13-1898f5c0e004.jpg
63d87a84-4516-4cb1-9bce-28a701a966c4.jpg
30faa5fb-5ce8-4831-8303-4d93a5630c53.jpg
8bff4b20-c73a-4fc5-a246-40e91d77dcd3.jpg
426347da-9b98-4f8d-b55f-277f81e8b5c1.jpg

Social value. The resident was handed a complete pack: what was installed, how to use it, and who to contact.

If someone is thinking about applying, go ahead without hesitation.

Jean Roberts, Lancashire

Area feedback: a Cosy Homes in Lancashire resident, not the Darwen household

The project

A house in Darwen with solar PV, battery storage and an air source heat pump installed, an insulated extension and internally insulated walls. We visited to survey the whole house and confirm the handover to the resident.

What we did

We surveyed the property and imaged the walls inside and out with a thermal camera. We checked on site that the resident’s Cosy Homes in Lancashire Warm Completion Pack was complete and in order: the completion letter, electrical certificate, guarantees and certificates, the complaints procedure leaflet and the energy advice leaflet.

Why it matters

A retrofit is only as good as the handover. Thermal imaging shows whether the insulation is continuous, and the completion pack makes sure the resident knows what was installed, how to use it and who to contact.

Result

Wall surface temperatures read evenly and did not suggest cold bridging at the locations imaged. The insulation had been overlapped well, including at window reveals. The lowest readings were at corners and window reveals, as expected at those junctions. Readings are indicative: the outside temperature was about 12 °C with rain at the time.

Measures installed
  • Solar PV with battery storage (SunSynk inverter and battery)

  • Air source heat pump

  • Insulated extension and internal wall insulation

Who was involved

Programme

eb637bbf-8693-4c83-9c58-11e8346ec10c.png
2e0cc438-be9e-4b73-9118-769a81e2cdef.png

Inverter and battery

Sunsynk

Survey and coordination

6fb691e3-1ad4-4ec0-8a84-60e13b49d307.png

Photo Gallery

Keep exploringKeep exploring

See our case studies

Flagship
Cosy Homes in Lancashire

15,782 measures coordinated, 100% TrustMark pass, with the coverage map.

Explore the programme →
90125ad1-4f46-4cb0-922d-d9322421950c.png
Case Study
Morecambe

Solar, battery and wall insulation. Warm Homes: Social Housing Fund.

View Case Study →
c469640e-b0ac-4c18-9409-281caa365416.jpg
Case Study
Darwen

A whole-house retrofit: solar, heat pump and battery, checked with thermal imaging.

View Case Study →
c54e0952-4952-4500-90b4-464ed6ae20e5.jpg
Case Study

Social Housing Decarbonisation Fund, three blocks, delivered through RHEA Projects.

View Case Study →
0d702f2a-4dc9-43c8-85b1-16a870dbf34f.jpg
Case Study
Wirral

Solid-wall flat insulated inside and out under ECO4 and GBIS.

View Case Study →
33d4e6d6-a392-4aff-afa0-d806d07cdf28.jpg
Case Study
Newton House, Preston

Boiler Upgrade Scheme, ECO and GBIS blended on one property.

View Case Study →
2686b235-92dc-46d2-a3ca-0f58606eb621.jpg
Case Study
Orbit, West Midlands

SHDF coordination with Lovell and Vinci.

View Case Study →
Case Study
Riverside and Savills

Stock condition inspections across a housing portfolio.

View Case Study →
Commercial Case Study
Crown House, Crown Oil

Solar pre-assessments across a commercial portfolio, installed by third-party specialists.

View Case Study →
2fe7ac92-b564-4f08-95a5-56d49b3db91a.jpg
Talk to us about your project
Contact us
bottom of page