Case study
Morecambe: solar, battery and wall insulation on a 1970s bungalow
Warm Homes: Social Housing Fund, Lancaster City Council. An area example of our Cosy Homes in Lancashire work in Morecambe.

Location
Morecambe, Lancashire
Funding
Warm Homes: Social Housing Fund, Lancaster City Council
Property
Semi-detached bungalow, 1967–75, system built, no wall insulation
Our role
Assessment, design, coordination and TrustMark lodgement
Installers
Baldwin Building Services (walls), ASC Electrical (solar and battery)
Year
2026
8
Jinko 470 W solar panels
3.8 kWp
solar array
D 58 → C 73
EPC, designed outcome
3,230 kWh
estimated generation a year
On site





Social value. Local supply chain: wall insulation by a Lancaster firm, solar by an installer from the Fylde coast. Lower running costs for a home funded through the Social Housing Fund.
The team have been excellent throughout. They feel like family, and the energy bills have dropped significantly.
Neil Pickup, Morecambe · Solar PV · Solar battery · Room in roof
Cosy Homes in Lancashire resident, Morecambe
The project
A semi-detached 1970s bungalow in Morecambe, done through Cosy Homes in Lancashire with Warm Homes: Social Housing Fund money from Lancaster City Council. The walls are system built with no insulation, and there was nothing on the roof. We assessed the house, designed the work, coordinated the two installers and lodged it with TrustMark.
What went in
The walls were done first, in June 2026: 90 mm EPS insulation boards finished in silicone render. The boards went over the existing pebble dash once a pull-out test showed the fixings would hold in the wall behind it. The solar went on in August: eight Jinko 470 W panels on the south-facing roof, 3.8 kWp in total, wired to a Sunsynk hybrid inverter with a battery, so the house can store daytime generation and use it in the evening.
Why in that order
Insulating first cuts the heat the house needs. The solar and battery were then sized for the smaller demand, not the old one.
Result
EPC D (58) at assessment, with a designed outcome of EPC C (73). The MCS estimate for the array is about 3,230 kWh of electricity a year. Both measures were lodged with TrustMark on 9 September 2026.
Measures installed
-
External wall insulation wherever it could be used, and internal wall insulation where it could not
-
Electric storage heating, sized against a new solar PV array
-
A ventilation strategy designed from the measured plan before any insulation was fixed
Who was involved
Installed by


Inverter and battery
Sunsynk
Programme and coordination


Products
EWI Pro
Jinko Solar
Funded by
DESNZ

Photo Gallery


Keep exploringKeep exploring
See our case studies
Case Study
Social Housing Decarbonisation Fund, three blocks, delivered through RHEA Projects.